This page no longer exists.You are seeing the homepage instead.Requested: /news/market-news/latest/metric-evaluate-public-bitcoin-miner
Go to News
Brent Oil
Loading...
USD/bbl
BTC Revenue
Loading...
/MWh
HPC Premium
Loading...
Multiple
H100 Index
Loading...
H200 Index
Loading...
B200 Index
Loading...

Featured Story

Bitdeer Secures 67MW AI Data Center Campus in Malaysia, Bringing Total to 273.5MW
AI / HPC

Bitdeer Secures 67MW AI Data Center Campus in Malaysia, Bringing Total to 273.5MW

Editor's note: Bitdeer withdrew an earlier October 8 announcement and instructed recipients to disregard it, subsequently issuing a replacement release. The original described a 60 MW A103 facility at its existing Cyberjaya campus and a total secured AI Cloud capacity of 333.5 MW, equivalent to 95% of its 350 MW target. The replacement instead identifies a new 67 MW A901 campus and reports 273.5 MW of secured capacity, or approximately 78% of its target. The facility's location, agreement duration, hardware specifications and delivery timeline also changed. This article reflects the replacement announcement. TheEnergyMag's earlier social media coverage was based on the withdrawn release.

Market News|9h ago|1 min read

Latest Stories

Comprehensive Company Coverage

From Vistra and Constellation to CoreWeave and NVIDIA. We track the entire supply chain from fuel to floating-point operations.